Announcement

Collapse
No announcement yet.

Monorail in December???

Collapse

Ad Widget

Collapse
This topic is closed.
X
X
  • Filter
  • Time
  • Show
Clear All
new posts

  • Monorail in December???

    Would anybody happen to know if the monorail will be back in December; specifically 18th - 23rd? If so, will it be the regular route or cut-off at some point? mahalo for any info.

  • #2
    Re: Monorail in December???

    Hard to say

    both Sub and Monorail station area are all dirt.
    One ramp to the monorail is put in



    darkbeer have better picture.
    AKfandisney Have a Magic Disney day šoš 2010
    Alan





    Toy Story Mania construction:
    Older photo
    New Photo

    Member of
    MiceChat WDW Trip
    Next trip
    2014 Dec, 31

    Comment


    • #3
      Re: Monorail in December???

      The scheduled return of the Monorails is December 16th, and as far as I know, they are on schedule to make that date.

      When it returns, it will once again be in "shuttle" mode offering one-way trips from Tomorrowland to Downtown Disney thru DCA.

      The Lagoon section of the track will still be closed due to the Finding Nemo construction.
      Check out my Theme Park Photos at http://darkbeer.smugmug.com

      Comment


      • #4
        Re: Monorail in December???

        Thank you, both, very much for the update. I just found the -monorail blue- post and saw the great photos. I've got my fingers crossed, really want to ride it again.

        Comment


        • #5
          Re: Monorail in December???

          That poor "Lagoon" section... was that set to be back in march? What was that date?

          Comment


          • #6
            Re: Monorail in December???

            Then will the walls come down for most of the lagoon?
            Friend walks into line of The Many Adventures of Winnie the Pooh-
            "Come on, Let's go see Country Bear- .......Oh."
            -August 1st 2010

            And this elevator traverls directly to The Twilight Zone The Gift Shop!
            -August 2nd 2010

            Comment


            • #7
              Re: Monorail in December???

              The Lagoon section will more than likely not return until May or June... (maybe earlier)

              As for the Lagoon walls, they will stay up.

              The new entrance to the Tomorrowland station is the east end, next to Autopia, so you will have a pathway basically where the old Autopia exit was to the new rampway to the upper level. Of course, refurb walls will block the Finding Nemo queue construction.
              Check out my Theme Park Photos at http://darkbeer.smugmug.com

              Comment


              • #8
                Re: Monorail in December???

                I thought the monorail system was closed until Fall 2007??

                Comment


                • #9
                  Re: Monorail in December???

                  Originally posted by Ghostbuster626 View Post
                  I thought the monorail system was closed until Fall 2007??
                  Things change.... As I understand it, the Disneyland Resort Hotel Senior Managers really pushed to have the Monorail up and running as much as possible, especially during peak periods. So much so, they were willing to help fund additional costs to keep the Monorail available to Hotel guests as much as possible.
                  Check out my Theme Park Photos at http://darkbeer.smugmug.com

                  Comment


                  • #10
                    Re: Monorail in December???

                    Wasn't May/June the delivery date of the first new Monorail train, as well?

                    Comment


                    • #11
                      Re: Monorail in December???

                      The new layout sounds interesting - a reversal of the platform. It's still going to cause problems with having the lift over the other side of the platform though, as they would now need an extra CM to guard the lift from line jumpers. I still with they did more work on the station - now would have been a great time for less dated railings, de-bronzeification and a new canopy.
                      Last edited by drnilescrane; 10-23-2006, 03:01 AM.

                      Comment


                      • #12
                        Re: Monorail in December???

                        Originally posted by drnilescrane View Post
                        The new layout sounds interesting - a reversal of the platform. It's still going to cause problems with having the lift over the other side of the platform though, as they would now need an extra CM to guard the lift from line jumpers. I still with they did more work on the station - now would have been a great time for less dated railings, de-bronzeification and a new canopy.
                        The lift is scheduled for removal, since it was placed right where one of the subs load. The new ramp is designed with ADA laws in mind, and the slope is designed for wheelchairs to use without problems.

                        The new layout should require less CM's to operate, as all Cm's now will work on the second level and can do multiple functions (such as count guests thru the turnstile at the top of the ramp, and then help with load/unload while the train is at the station).
                        Check out my Theme Park Photos at http://darkbeer.smugmug.com

                        Comment

                        Ad Widget

                        Collapse
                        Working...
                        X